Is planning approval approval same as building regulation?
Do your fees include Council Planning and Building Regulation fees?
No-The Planning fee and Building Regulation fees made payable to the Local Authority are in addition to our fees.It should be noted that the Council fees varies and is dependant upon the type of proposal. We will advise you of the costs in writing prior to making the submissions. Planning is usually £150.00 where the application relates to one dwelling house.Certificate of Lawful Permitted Development is usually half the amount that would be payable in respect of an application for planning permission for similar works. Building Regulation fees vary from £100.00 onwards based on the type of construction proposed.
What is included in my planning package?
• Consultation
• Full property survey
• 2 copies of your existing & proposed conversion plans
• 2 free amendment cover
• Form completion
• Application submission
• Ordinance maps
• On-line checker service
How long until I get a decision from the Council for Planning & B. Regulations Applications?
The process for obtaining Building Regulations approvals takes approximately five to six weeks. At Plan B Architecture we usually submit Building Regulation drawings after planning has been granted so that we are sure of the final approved design. It’s only at the client’s request that we submit a Building Regulation application while the Planning application process is ongoing. Being realistic you should allow a minimum of 3 months to obtain both sets of approvals from your local authority.
What documents are needed for a Planning Application?
How do I know that I my project does require Planning Permission?
You will need to apply for Planning Permission to extend your property if:
• the volume of the house would increase by more than 10% or 50m3 (whichever is greater) for terraced properties.
• the volume of the house would increase by more than 15% or 70m3 (whichever is greater) for any other house type
• you live in a conservation area, National park or Area of Outstanding Natural Beauty
• the extension is closer to any highway than any part of the original house (a footpath is also classed as a highway)
• the extension is higher then the roof of the original house or is over 4m high (pitched roof) or 3m high (flat roof)
• you are using over half of your external garden space
• the building is a Listed Building
These are only general rules for when you will need to apply for Planning Permission, and each project should be looked at individually. We would always advise seeking written confirmation that your development does not require Planning Permission from the Local Authority.Even if you have had no previous extensions, here are some examples of the type of extensions that in most cases need planning permission, to give you an idea:
• A dormer window in the roof of your house facing the road;
• A two story extension;
• A extension to the front of your house, or to the side if it faces a road.
If I change my mind later can the plans be amended and will I be charged for that?
I would like to do most of the work myself, can I just use you for preparing drawings?
I do not have existing drawings of the site, can you provide a survey for me?
What is "Permitted Development"? Am I eligible for that?
Under regulations that came into effect on 1 October 2008 an extension or addition to your house is considered to be permitted development, not requiring an application for planning permission, subject to the following limits and conditions:
• No more than half the area of land around the "original house" would be covered by additions or other buildings.
• No extension forward of the principal elevation or side elevation fronting a highway.
• No extension to be higher than the highest part of the roof.
• Maximum depth of a single-storey rear extension :3 metres beyond the rear wall for an attached house and 4 metres beyond the rear wall for a detached house.
• Maximum height of a single-storey rear extension of 4 metres.
• Maximum depth of a rear extension of more than one storey of 3 metres beyond the rear wall including ground floor.
• Maximum eaves height of an extension within 2 metres of the boundary of 3 metres.
• Maximum eaves and ridge height of extension no higher than existing house.
• Side extensions to be single storey with maximum height of 4 metres and width no more than half that of the original house.
• Two-storey extensions no closer than 7 metres to rear boundary.
• Roof pitch of extensions higher than one storey to match existing house.
• Materials to be similar in appearance to the existing house.
• No verandas, balconies or raised platforms.
• Upper-floor, side-facing windows to be obscure-glazed; any opening to be 1.7m above the floor.
• On designated land no permitted development for rear extensions of more than one storey.
• On designated land no cladding of the exterior.
• On designated land no side extensions.
Can I convert my house into flats?
While doing a flat conversion a good design makes all the difference as it aims to achieve maximum number of flats possible within the given area and the guidelines.
Plan B Architecture has a significant experience in doing flat conversions .Kindly contact us for more information.
What type of property is suitable for a flat conversion?
• Other large non-residential properties suitable for conversion subject to compliance with other policies in the Local Plan.
• Any property that is in existing use as bedsits or an HMO which would benefit from upgrading to self-contained flats.
• Any shops with vacant space above.
• Housing in unsustainable locations, i.e. not close to public transport and remote from shops, jobs, schools etc.
• Properties adjacent to ‘bad neighbour’ uses e.g. above or near bars, take-aways or noisy industrial premises.
• Hotels of over 30 bed spaces and hotels in prime holiday areas.